B&H Projects

  • 42 miles of 20" steel pipe on the Navajo Indian Reservation, including large-bore directional drill under the San Juan River, 35 conventional road / canal bores and two major wash crossings

  • Seven miles of 24" steel pipe for a mix of residential and commercial property including an open cut in the Salt River

  • 12 miles of 4", 6" and 10" steel pipe across two 1,400 LF sections of the Pine River including miscellaneous lengths of 6" HDPE water line

  • 200 well ties for new gas wells drilled in the San Juan Basin for Williams Field Services

  • Environmental cleanup project for a large release of oil on a pipeline project in Andrews, TX;  the oil impacted soil was remediated, excavated, tested, blended with clean soil and backfilled after meeting the Railroad Commission's required soil testing standards