Hydrostatic testing of 30 miles of 20" steel natural gas transmission pipeline running cross country through mountainous terrain
39,000 LF of 12" steel natural gas cross country gathering pipeline for Marcellus shale gas
25,000 LF of eight-way and six-way 6" electric duct bank concrete encased including manholes in the road berm and street at a government installation
4,200 LF of 8-way 6" transmission duct back with an 800 LF directional bored river crossing in a large metropolitan business district
870,000 LF of 1 1/4" to 8" of annual gas distribution pipeline blanket work which includes replacement, new business, conversion mainline, service lines, maintenance and repairs including cathodic protection